The Orion Amphitheater
Huntsville, AL | Other
Project Specifications:
The Orion Amphitheater is a once in a lifetime project that brings a taste of the Roman Coliseum era to the present day. Using EIFS, which offered design flexibility, energy efficiency, code compliance, cost effectiveness, low maintenance, and timely installation, the project was constructed in seven months during EPS foam allocation and opened as scheduled. The design, which incorporates over 52 Custom EPS profiles, six three dimensional Keystones, and two colors and textures, exemplifies all of the advantages and features of utilizing EIFS.
Manufacturer: Dryvit Systems, Inc.
Contractor: Johnson & Sons Plastering
Distributor: Continental Building Solutions
Owner/Developer: The City of Huntsville
Architect: David M. Schwarz Architects, Inc.