Clovis Community Medical Center - Phase C
Clovis, CA
Category: Healthcare The original tower design of this project consisted of thousands of square feet of aluminum metal panels. The owner wanted to reduce cost on the new phase while achieving the same look, so EIFS with Drainage with a metallic finish was used, saving hundreds of thousands of dollars and months of installation time. A total of 15,000 square feet of metallic finish was used, complemented by 100,000 square feet of EIFS with Drainage with a coarse finish on the rest of the project. |